Project

General

Profile

Roadmap

PESI ready for EU-BON

about 5 months late (10/15/2016)

0%

8 issues   (0 closed — 8 open)

This milestone corresponds to the EU-BON milestone MS121: Taxonomic backbone databases integrated with EDIT platform and EU BON portal (M12) now M20

Unassigned CDM tickets

about 3 months late (12/30/2016)

1%

457 issues   (1 closed456 open)

Tickets that need discussion and assignment during the next ticket assignment meeting.

Redlist 2020 - Milestones for 2016

about 3 months late (12/31/2016)

28%

20 issues   (1 closed19 open)

Redlist 2020 - Milestones 2016

Aufgaben Januar

Technische Bereitstellung von 3 Instanzen der EDIT Platform for Cybertaxonomy für (i) Gefäßpflanzen, Algen und Moose, (ii) Pilze inkl. Flechten und Schleimpilzen und (iii) Tiere. Die Leistung schließt ein:

Datensicherheit durch Backups und security-updates

Hohe Verfügbarkeit nach außen (angestrebt 24/7)

Software-Updates und ggf. Datenmigration (Software-Pflege).

Ergebnisse und Zeitplan

  • 31. Januar 2016: Die 3 neuen Plattforminstanzen sowie ein Prüfplan stehen zur Verfügung.

Aufgabe Februar
Import der Checkliste Moose aus dem Berlin-Modell (Stand „Referenzliste der Moose Deutschlands von 2000“ und ergänzte Checklisten Europas)

Aufgabe März

Vorhabensteil 2: Datenbereitstellung

  • Portaleinrichtung und Anpassung incl. Design- und Textabstimmung abgeschlossen (letzteres setzt Kooperation seitens des BfN voraus)

Vorhabensteil 3: Importe

  • Gefäßpflanzenimport A incl. Klärung des Formats und Kommunikation zu weiteren Datenproblemen (Termin abhängig von rechtzeitiger Datenbereitstellung – min. 2 Monate vor dem genannten Termin).

Aufgabe April

Vorhabensteil 3: Importe

  • XML Output Routine für den Input-Output Vergleich
  • Verknüpfung der Checkliste Moose (Berlin-Modell) und der Rote Liste Moose Deutschland von 2015 über die Rote Liste von 1996 als gemeinsame Bezugsbasis

Aufgaben September

Vorhabensteil 2: Datenbereitstellung

  • Download- und Service-Schnittstellenerweiterung für Landeslisten (incl. Testen) implementiert; Kurzdokumentation steht zur Verfügung

Vorhabensteil 3: Importe

  • Gefäßpflanzenimport B incl. Klärung des Formats und Kommunikation zu weiteren Datenproblemen

Vorhabensteil 4: Vorarbeiten zur Integration von Länderlisten

  • Eingabemaske mit Rechtemanagement, Voreinstellung Standardgebiet, Vorkommensstatuszuweisung verschiedenen Normen] implementiert und getestet

** Aufgabe Dezember **

Vorhabensteil 5: Vorbereitung von Checklisten für die RL 2020

  • Mindestens 2 Experten sind mit der Plattform vertraut und benutzen sie als Arbeitsgrundlage

Euro+Med Migration

about 2 months late (01/20/2017)

33%

80 issues   (26 closed54 open)

Full Migration of Euro+Med to CDM Platform

=================================================

  • EDITOR: implement missing editing via editor (local & remote, ~ 12 user) - #2622, #2628

  • MASSIMPORTS: reuse or rebuild the existing import workflow for massimports - #2623

  • BACKUPS: - #2624

Update Documentation

57 days late (01/28/2017)

0%

18 issues   (0 closed — 18 open)

The end of the year we should always try to update documentation. This is a collection of tasks to be done.

Euro+Med Portal Release

54 days late (01/31/2017)

39%

55 issues   (21 closed34 open)

Migration of Euro+Med to CDM so far that E+M CDM Portal can be released

==============================================================================

  • IMPORT data from BerlinModel to CDM - #2620, #1442, #3195 (Import of common names)

  • PORTAL: implement data portal (minimum requirement: same functionality as current E+M portal) - #2621, #2758

  • AGGREGATION: rebuild existing data aggregation workflows - #2625

  • PUBLICATION: rebuild or create new publication workflows - #2626

  • GEOGRAPHY: mapservices, area mapping and vocabularies - #2623, #2614

TaxEditor Redesign

53 days late (02/01/2017)

0%

2 issues   (0 closed — 2 open)

Redesign of the TaxEditor, which primarily includes,

  • Create independent UI components (Composites, Widgets etc) which can be easily updated using GUI designers (like WindowBuilder Pro)

  • Reduce dependency on cdm entity types (and related enums) for the creation of UI components.

Release 4.6

38 days late (02/16/2017)

Release 4.6 of the EDIT Platform

68%

87 issues   (53 closed34 open)

cdmlib-remote cleanup

11 days late (03/15/2017)

0%

2 issues   (0 closed — 2 open)

We need a major refactoring of the cdmlib-remote package using latest spring functionality, etc.

Redlist 2020 - March 2017

Due in 5 days (03/31/2017)

50%

2 issues   (0 closed — 2 open)

Vorhabensteil 3: Importe

  • Schmetterlingsimport, Klärung des Formats und Kommunikation zu weiteren Datenproblemen (Termin abhängig von rechtzeitiger Datenbereitstellung – min. 2 Monate vor dem genannten Termin)

CDM UML 4.6

Due in 21 days (04/16/2017)

CDM model version 4.6. Follows CDM UML 4.1

5%

63 issues   (0 closed — 63 open)

Release 4.7

Due in 29 days (04/24/2017)

6%

201 issues   (1 closed200 open)

Release 4.8

Due in about 2 months (05/28/2017)

No issues for this version

Redlist 2020 - November 2017

Due in about 8 months (11/30/2017)

0%

1 issue   (0 closed — 1 open)

Vorhabensteil 3: Importe:

  • Gefäßpflanzenimport C incl. Klärung des Formats, Kommunikation zu weiteren Datenproblemen und Implementierung neuer Datentypen des Ergänzungsbandes (Termin abhängig von rechtzeitiger Datenbereitstellung – min. 3 Monate vor dem genannten Termin)

Redlist 2020 - December 2017

Due in about 9 months (12/31/2017)

0%

1 issue   (0 closed — 1 open)

Vorhabensteil 5: Vorbereitung von Checklisten für die RL 2020:

  • Mindestens 4 Experten sind mit der Plattform vertraut und benutzen sie als Arbeitsgrundlage

Redlist 2020 - May 2018

Due in about 14 months (05/31/2018)

0%

1 issue   (0 closed — 1 open)

Vorhabensteil 5: Vorbereitung von Checklisten für die RL 2020

  • Plattform Tools auf Workshop demonstriert

FdAC vol.1 published

0%

9 issues   (0 closed — 9 open)

Printed publication of Flore d'afrique centrale ready. This includes all data edited correctly, maps generated including histogramms, and print publication ready for all the content.